Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 9 results ...

Ahmed, S M, Ahmad, R and Saram, D D D (1999) Risk management trends in the Hong Kong construction industry: a comparison of contractors and owners perceptions. Engineering, Construction and Architectural Management, 6(03), 225–34.

Boussabaine, A H, Thomas, R and Elhag, T M S (1999) Modelling cost-flow forecasting for water pipeline projects using neural networks. Engineering, Construction and Architectural Management, 6(03), 213–24.

Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(03), 287–98.

Gunner, J and Skitmore, M R (1999) Pre-bid building price forecasting accuracy: price intensity theory. Engineering, Construction and Architectural Management, 6(03), 267–75.

Jaafari, A and Manivong, K (1999) The need for life-cycle integration of project processes. Engineering, Construction and Architectural Management, 6(03), 235–55.

Kaka, A P (1999) The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering, Construction and Architectural Management, 6(03), 256–66.

Kartam, N A (1999) Design/construction integration: issues and illustrative prototype. Engineering, Construction and Architectural Management, 6(03), 299–314.

Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(03), 315–28.

Pasquire, C (1999) The implications of environmental issues on UK construction management. Engineering, Construction and Architectural Management, 6(03), 276–86.